POND AND CULVERT PROJECT

Some pictures from the Edenton North project involving bank stabilization and culvert repair. HR Bookstrom was contracted for this project.  They started June 4, 2021 and completed work July 8, 2021.  A Community Assistance Grant from the Lower Platte South NRD was obtained to pay 50% of the costs.

PICTURES OF BANK EROSION, SEPERATION OF CULVERTS AT THE NORTH END OF SOUTH POND AND CULVERT EROSION.

DURING CULVERT REPAIR

After rip rap was installed, the contractor repaired most areas with fill dirt, over-seeding and matting.


 NORTH POND

SOUTH POND